Teaching pack · UAT 316
A 15-week teaching plan, 5 worksheets, a scoring rubric and a map from the course description to the lessons, for instructors to evaluate and adapt before teaching.
Coverage of the course description
The lessons fully teach 15 of 15 description topics. Each topic lists the modules and lesson sections that teach it, and incomplete topics say what is missing.
| Description topic | Modules | Where it is taught | Status |
|---|---|---|---|
| Technology project life cycles | M1 | Module 1: What a project is (predictive, agile and hybrid life-cycle table) · Agile and Scrum · activity item 4 choosing the approach for each part of the project | Covered |
| Scope management | M1M2 | Module 1: Project charter and WBS · Module 2: Change control and stop conditions | Covered |
| Time management | M1 | Module 1: The critical path (CPM) and Example 1 three-point estimate | Covered |
| Cost management | M2M4 | Module 2: Earned value management (Example 1) · Module 4: Total cost of ownership and break-even · The time value of money · NPV, IRR and payback | Covered |
| Quality management | M2M4 | Module 2: Managing project quality (quality planning, QA and QC, acceptance-criteria table, cost of quality and Example 2 Pareto analysis) · KPIs you can decide with (first-pass acceptance) · Module 4: acceptance criteria in the TOR | Covered |
| Resource management | M1 | Module 1: Allocating and levelling resources (skills matching, resource calendar, resource histogram, smoothing versus levelling, and Example 2 the three-person team) · activity item 5 | Covered |
| Risk management | M2 | Module 2: Risks and stakeholders (ISO 31000 process, risk register, likelihood–impact matrix) | Covered |
| Team and stakeholder management | M1M2 | Module 2: Managing the team and engaging stakeholders (RACI, Tuckman stages, communication plan, five conflict modes, engagement plan and Example 3) · Risks and stakeholders (power–interest grid) · Module 1: Scrum accountabilities | Covered |
| Feasibility studies | M5 | Module 5: Five dimensions of feasibility · Choosing with evidence | Covered |
| Innovation management | M3 | Module 3: Two kinds of innovation (TRL) · Lean Startup and the MVP (Example 1) | Covered |
| Intellectual property | M3 | Module 3: Intellectual property in Thailand · activity item 4 | Covered |
| Business models | M3 | Module 3: The Business Model Canvas and Example 2 contribution margin per job | Covered |
| Market analysis | M5 | Module 5: Market size (TAM, SAM, SOM) · The full business plan (market analysis, competitors and SWOT) | Covered |
| Business planning | M3M4M5 | Module 5: The full business plan (ten-section outline from the SBA and DBD, and Example 1 three-year income statement with monthly cash flow) · Module 3: The Business Model Canvas · Module 4: NPV, IRR and payback | Covered |
| Technology commercialization | M3M5 | Module 3: Technology commercialization (five routes, WIPO technology-transfer steps, NSTDA licence terms, the Research and Innovation Promotion and Utilization Act B.E. 2564 and Example 3 licence versus spin-off) · Module 5: Structuring the pitch | Covered |
Weekly teaching plan
| Week | Topic | Pre-class | Lecture | Lab | Evidence |
|---|---|---|---|---|---|
| 1 M1 | What a project is and the project life cycle | Read module 1 'Why this matters' and 'What a project is' | Projects versus operations, the life cycle and the scope, time and cost constraints | Discuss the drone survey service unit case; separate project work from operations | Group discussion notes |
| 2 M1 | Project charter, WBS and time estimates | Read 'Project charter and WBS'; run Example 1, a three-point estimate for procurement | Goals, scope, exclusions, deliverables and work breakdown | Activity sheet 1 part A: write a one-page charter and extend the WBS one level | Group charter and WBS |
| 3 M1 | The critical path, resources, Agile and Scrum | Read 'The critical path', 'Allocating and levelling resources' and 'Agile and Scrum'; take the module 1 quiz | Finding the critical path and float, resource histograms, smoothing versus levelling, and when to use agile | Activity sheet 1 part B: permits two weeks late; recompute the critical path, propose a way to crash, draw the group's resource histogram and discuss predictive versus agile | Activity sheet 1 and quiz result |
| 4 M2 | Earned value management | Read module 2 'Earned value management'; run Example 1 | PV, EV, AC, CPI, SPI and forecasting cost at completion | Activity sheet 2 part A: take roles; the manager reports week-6 status with EVM figures | One-page status report |
| 5 M2 | KPIs, quality, risks and stakeholders | Read 'KPIs you can decide with', 'Managing project quality' and 'Risks and stakeholders' | KPIs that drive decisions, quality planning, QA versus QC, cost of quality, Pareto charts, the risk register and the power–interest grid | Activity sheet 2 part B: compute the CPI needed on remaining work and add two risks with owners | Calculation and risk register |
| 6 M2 | Team management, change control and stop conditions | Read 'Managing the team and engaging stakeholders' and the change-control section; take the module 2 quiz | RACI, team development stages, communication plans, conflict handling, stakeholder engagement, change requests and conditions for stopping a project | Activity sheet 2 part C: write three KPIs, two stop conditions, a quality plan and a five-activity RACI, then hold a role-played review meeting | Activity sheet 2 and quiz result |
| 7 M3 | Two kinds of innovation and TRL | Read module 3 'Two kinds of innovation' | Sustaining versus disruptive innovation and technology readiness levels | Activity sheet 3 part A: choose the group's drone service, rate its TRL and draft a Business Model Canvas | Draft BMC |
| 8 M3 | Lean Startup, the MVP and the Business Model Canvas | Read the Lean Startup and Business Model Canvas sections; run Examples 1–2 | The riskiest assumption, decision criteria set before results and contribution margin | Activity sheet 3 part B: design an MVP testable in two weeks and compute jobs needed per month | MVP plan and contribution-margin calculation |
| 9 M3 | Intellectual property, technology commercialization; midterm | Read 'Intellectual property in Thailand' and 'Technology commercialization'; review modules 1–3; take the module 3 quiz | Routes to market and the research-utilization Act (first hour); midterm examination (modules 1–3) | Activity sheet 3 part C: decide which IP protects each result, what must not be disclosed before filing, and the route to market with licence terms | Activity sheet 3 and midterm score |
| 10 M4 | Total cost of ownership and break-even | Read module 4 'Total cost of ownership and break-even' | Purchase and operating costs; make versus buy | Activity sheet 4 part A: do worksheet E02, compute TCO for two options, add 30% maintenance and find the new break-even | TCO table and break-even |
| 11 M4 | Time value of money, NPV, IRR and payback | Read the time-value and NPV/IRR sections; run Example 1 | Discounting, discount rate and the meaning of IRR | Activity sheet 4 part B: compute NPV at 6% with cash flow cut to 250,000 baht a year and find the minimum cash flow keeping NPV non-negative | NPV calculations |
| 12 M4 | Public procurement | Read the public procurement section; take the module 4 quiz | TOR, acceptance criteria and assumptions that mislead analysis | Activity sheet 4 part C: list five costs the example ignores and draft three TOR acceptance criteria | Activity sheet 4 and quiz result |
| 13 M5 | Five dimensions of feasibility and market size | Read module 5 'Five dimensions of feasibility' and 'Market size' | Market, technical, financial, legal and operational feasibility; estimating TAM, SAM and SOM | Activity sheet 5 part A: build the five-dimension feasibility table with evidence held and still needed | Feasibility table and market estimate |
| 14 M5 | Choosing with evidence, the business plan and structuring the pitch | Read 'Choosing with evidence', 'The full business plan' and 'Structuring the pitch'; take the module 5 quiz | Weighted matrices, the tipping point of a decision, the business-plan outline, profit versus cash, and a five-minute pitch outline | Activity sheet 5 part B: build the weighted matrix and find the weight change that flips the decision, then draft the business-plan outline and the first-year monthly cash flow | Matrix, draft slides and quiz result |
| 15 M5 | Service-unit pitches and course review | Rehearse the five-minute pitch; review all modules | Review modules 4–5 and connect project and business thinking | Activity sheet 5 part C: pitch, then act as a panel asking at least three questions that challenge assumptions, and score | Pitch and participation; final examination (all modules) after week 15 |
Worksheets and instructor guide
One worksheet per module. Students open it on the web, print it or download the .docx. The instructor guide under each worksheet gives the class timing, expected results, discussion questions and notes for students with different backgrounds.
1Worksheet 1 Planning the service-unit project
Analysis activity · About 3 h of class time · CLO1
Objective: Write a project charter, break down work with a WBS, analyse the critical path under delay and choose predictive or agile approaches
Equipment
- The drone survey service-unit case in the lesson
- Computer with Python and the example code at /downloads/uat-316/
- Paper or a spreadsheet
Safety
- Desk work only; no flying
Steps
- Write a one-page charter with goal, scope, exclusions, deliverables and measurable success criteria
- Extend the WBS in Figure 1 one level and check each package has a single owner
- Estimate procurement time with the three-point method of Example 1
- Assume permits are two weeks late; recompute the critical path with the lesson code and propose one way to speed up
- Give each work package a number of people, draw the resource histogram with the code in Example 2, and propose smoothing, levelling or adding people
- Discuss which parts suit a predictive approach and which suit agile
Deliverables
- One-page charter
- WBS with owners
- Critical path before and after the delay, with the speed-up option
- Conclusion on approach
- Resource histogram and over-allocation options with their effect on the finish date
Checklist
- The charter states goal, scope, exclusions, deliverables and at least one measurable success criterion with a number
- Table 1 is broken down by deliverable, not by department, and every work package has one owner, a duration and a number of people
- Table 2 has all 7 tasks before and after the delay, names the critical path and project duration, and attaches the code output
- The proposed speed-up acts on a critical-path task and states how many weeks it saves
- The predictive or agile conclusion gives a reason for each part, and the over-allocation option states its effect on the finish date as a number, ready to answer the sponsor
Instructor guide
Class timing
- Introduce the service-unit case and review charter and WBS20 min
- Write the charter and extend the WBS into Table 145 min
- Three-point estimate and critical path before and after the delay45 min
- Resource histogram and over-allocation options40 min
- Discuss predictive or agile20 min
- Wrap-up, questions and hand-in checklist10 min
Expected results
- Table 1: each of the five groups in Figure 1 (permits and law, equipment, people, data system, pilot) broken into at least two deliverable-based packages, such as drone registration, insurance, equipment specification and TOR, pilot training and the operations manual. Every row names one person as owner (not a department). Durations and head counts are the group's own assumptions, so check consistency rather than a single right value.
- Table 2 (lesson values): before the delay A 0/4 float 0, B 0/6 float 1, C 4/7 float 0, D 6/8 float 1, E 7/9 float 0, F 7/8 float 1, G 9/12 float 0, 12 weeks, critical path A-C-E-G. With A at 6 weeks: A 0/6 float 0, B 0/6 float 3, C 6/9 float 0, D 6/8 float 3, E 9/11 float 0, F 9/10 float 1, G 11/14 float 0, 14 weeks, critical path still A-C-E-G. If the group changed durations from its own WBS the numbers may differ, but they must match the code output.
- Record 3: PERT for procurement (o 4, m 6, p 11 weeks) gives 6.50 weeks with a standard deviation of about 1.17 weeks. The speed-up must act on the critical path: for example an extra trainer cuts pilot training (C) from 3 to 2 weeks, finishing in week 13, or to 1 week, back to 12 weeks; cutting test flights (E) by 1 week gives 13 weeks but makes F critical too; cutting procurement (B) by 2 weeks still finishes in week 14. Histogram as in Example 2 (team of 3): early start needs 4 and 5 people in weeks 7 and 8; smoothing (F moved 1 week) lowers the peak to 4 and keeps week 12 but weeks 7-8 stay over; levelling keeps to 3 people and finishes in week 14. A strong answer states the effect on the finish date and the cost of adding people.
- The project finishes in week 14, two weeks late, the same as the permit delay, because A is on the critical path and has no float. The critical path stays A-C-E-G. Procurement is the longest task but is not critical, and after the delay its float grows to 3 weeks, so speeding it up does not help at all (the common mistake of speeding up the longest task instead of the critical path).
- The expected 6.5 weeks is longer than 6 because the pessimistic value (11) lies further from the most likely value than the optimistic one (4), so running late is more likely than running early. Before the delay B has 1 week of float, so half a week late is fine, but the pessimistic 11 weeks would be 5 weeks late and critical at once. After the permit delay B's float rises to 3 weeks, so the risk falls but does not vanish, because the pessimistic case still exceeds the float. A strong answer uses the 1.17-week standard deviation in the reasoning.
- With Example 2's figures, weeks 7-8 need 4 and 5 people from a team of 3 (after the permit delay, with the same head counts, weeks 7-8 are still over at 4 people each). Smoothing keeps week 12 but stays over-allocated; levelling removes the overload but finishes 2 weeks late and puts the data system on the critical path. A strong answer offers costed options for the sponsor to choose, such as accepting 14 weeks or hiring a contract data specialist for weeks 7-8 and keeping the 12-week plan.
- Parts with clear requirements done in sequence, such as permits, procurement, insurance and pilot training, suit a predictive approach. Parts whose needs are unclear, such as the survey dashboard for the municipality, suit agile with short cycles and user reviews, so the whole project is hybrid. A strong answer names real delivery cycles and reviews for the agile part rather than just calling it agile.
Discussion questions
- If management insists on 12 weeks despite the permit delay, which numbers would you answer with, and what must be traded off?
- Why can a schedule that is logically correct by CPM still be impossible, and should resources be checked before or after setting the baseline?
- Who should approve the service unit's charter in a municipality, and what happens without one when scope conflicts arise?
Adapting to student background
- Upper secondary (M.6)
- Have them do the forward and backward pass by hand in the table before running the code and compare, and explain why PERT gives the most likely value four times the weight; pair them with a peer who has work experience to make the WBS realistic.
- Vocational certificate
- Start the WBS with cards on the desk, sorting packages from real work experience, then fill in a guided ES/EF table task by task, using the code output to check answers rather than deriving formulas.
- Diploma
- Extension: try several cuts to tasks C and E in the code, find the cheapest way to get back to 12 weeks, and check where a new critical path appears.
2Worksheet 2 A project review meeting
Analysis activity · About 3 h of class time · CLO1, CLO3
Objective: Report status with EVM, answer management with numbers, update the risk register and set KPIs and stop conditions
Equipment
- Week-6 status data from Example 1
- The knowledge unit on project governance and monitoring
- Calculator or the module 2 example code
Safety
- Desk work and role-play; no flying
Steps
- Take the roles of project manager, executive and auditor
- The manager reports week-6 status with EVM figures
- Compute the CPI required on the remaining work to finish on budget (remaining work divided by remaining money)
- Add two risks to the register with owners and responses
- Write three KPIs and two stop conditions following the knowledge unit
- Write a quality plan with at least three acceptance criteria and how each is checked, and a five-activity RACI checked with the code in Example 3
Deliverables
- One-page status report
- Required CPI calculation
- Updated risk register
- KPIs and stop conditions
- Quality plan and checked RACI
Checklist
- Table 1 has PV, EV, AC, CV, SV, CPI, SPI, EAC, VAC and the required CPI, all with baht units where relevant, and SV is not written as days
- Both new risks separate cause, event and impact, and have a likelihood x impact score, an owner and a response
- All three KPIs have a definition, denominator, data source, owner and review frequency, and both stop conditions contain a measurable number
- The quality plan has at least three acceptance criteria with how each is checked, and every RACI activity has one A and at least one R
- The one-page status report answers management with numbers and makes a clear recommendation (for example review scope or request budget)
Instructor guide
Class timing
- Review EVM and KPIs, assign roles20 min
- Compute EVM and the required CPI, then role-play the status report45 min
- Update the risk register30 min
- Write KPIs and stop conditions25 min
- Quality plan and RACI checked with the code45 min
- Wrap-up, questions and hand-in checklist15 min
Expected results
- Table 1 (Example 1 data: BAC 1,200,000 baht spread evenly over 12 weeks, 45% done, 620,000 baht spent): PV 600,000, EV 540,000, AC 620,000, CV -80,000, SV -60,000 baht, CPI 0.871, SPI 0.900, EAC about 1,377,778 baht, VAC about -177,778 baht, required CPI = (1,200,000 - 540,000)/(1,200,000 - 620,000) = 660,000/580,000 = 1.138. Accept rounding differences in the last digit.
- Table 2: keep R1 (16, high), R2 (10, medium) and R3 (6, low) and add the group's two. Acceptable examples: the lead pilot leaves before the pilot service, likelihood 3, impact 4, score 12, medium, treated by training a backup pilot and writing the manual; image data lost before processing, likelihood 2, impact 4, score 8, medium, treated by backing up to two places before leaving the site. Use the lesson's practice bands (15 and above high, 8-14 medium, below 8 low). Every risk has a named person as owner.
- Table 3: five activities, such as flight plan and permit, survey flights, map processing, acceptance check and community communication. Every row has exactly one A and at least one R. With the Example 3 draft the code finds that survey flights has no R (make the chief pilot both R and A, or name a pilot as R) and map processing has two A's (make the municipal engineer C and keep the project manager as A).
- The required CPI of 1.138 is 0.267 above the current 0.871, meaning the remaining work must suddenly be about 31% more efficient, which is unlikely unless the cause is fixed. A strong answer proposes finding the cause, then choosing between reducing scope through change control or requesting about 178,000 baht more in line with VAC, and does not promise to finish on budget without evidence.
- Example: the condition CPI below 0.85 for two reviews in a row is not triggered, because 0.871 is above 0.85, but only by 0.021. If CPI drops a little at the next review and stays below 0.85 at the one after, scope must be reviewed. A strong answer states the threshold, the data used and the action that follows when it triggers.
- Yes, for example R2, a crash during the pilot service, scores 10, below R1 (16), but has the highest impact of 5 because people could be hurt, so it needs controls (operations manual, checklists, insurance, geofence) even though it is unlikely. A strong answer says scores rank risks but judgement is still needed, and the bands in the lesson are practice values each organisation must set for itself.
- On-time 90% (18 of 20 sets) measures timeliness; first-pass 75% (15 of 20 sets) measures quality, so about one job in four needs rework, and the 2 sets awaiting coordinate confirmation must be counted separately, not as passed. A strong answer picks a KPI that measures the outcome users need, for example stop expanding if first-pass acceptance in the pilot is below 70%, rather than counting flights.
- Typical problems: an activity with no R or with two A's; fix it so there is one A and at least one R. Channels are n(n-1)/2: 6 for 4 people and 36 for 9 people, six times as many, so the team needs a written communication plan saying who needs what, when and in what form, with clear points of contact.
Discussion questions
- If an executive says half the money is spent so half the work must be done, how would you answer with the week-6 figures?
- EAC = BAC/CPI assumes past efficiency continues. When is that assumption not appropriate?
- When the chief pilot wants to cancel because the wind exceeds the drone's limit but the municipality wants the job done today, which conflict mode fits, and why?
Adapting to student background
- Upper secondary (M.6)
- Have them write every EVM formula and substitute by hand before running the code, then explain the required CPI to management in plain words; give extra role-play time to practise communication.
- Vocational certificate
- Use a fill-in EVM table with the formulas already written, calculating one value at a time with a calculator, and start the risk register from incidents they have met in real fieldwork.
- Diploma
- Extension: write an engagement plan for the community under the flight path (what they need to know, attitude, method, frequency, owner) and add it as a sixth RACI activity.
3Worksheet 3 Designing a drone service business
Analysis activity · About 4 h of class time · CLO2
Objective: Write a business model with the Business Model Canvas, design an MVP to test an assumption, compute contribution margin and plan IP protection
Equipment
- Business Model Canvas template
- Calculator or the module 3 example code
Safety
- Desk work only; no flying
Steps
- Pick one drone service, complete all nine BMC blocks and state the value proposition as a measurable sentence
- Pick the riskiest assumption and design an MVP testable within two weeks, with decision criteria set before seeing results
- Compute contribution margin per job and jobs needed per month with the group's assumed figures, as in Example 2
- State which type of IP should protect each result and what must not be disclosed before filing
- Choose a route to market with reasons, list the licence terms to negotiate, and state whether the research-utilization Act applies to the group's funding
Deliverables
- Business Model Canvas
- MVP plan with decision criteria
- Contribution margin and job-count calculation
- IP table
- Route-to-market proposal and licence terms
Checklist
- Table 1 has all nine blocks and the value proposition is a measurable sentence (with a number or time), not just high-quality service
- The MVP plan tests the riskiest assumption, fits in two weeks, and its decision criterion is written before data collection
- Table 3 shows price, variable cost, contribution margin, CM ratio, fixed cost and jobs needed rounded up to a whole number, each with a unit and source
- The IP table gives the type, term of protection and what must not be disclosed before filing for every result
- The route-to-market proposal gives reasons, at least three licence terms, and whether the Act applies to the group's funding
Instructor guide
Class timing
- Review innovation, Lean Startup and the Business Model Canvas25 min
- Choose a service and complete the nine-block Canvas50 min
- Design the MVP and decision criterion40 min
- Compute contribution margin and jobs needed35 min
- IP table and route to market60 min
- Wrap-up, questions and hand-in checklist30 min
Expected results
- Table 1: all nine blocks, consistent with each other. For a solar-panel inspection service: customer segment, owners of medium solar farms; value, know which panels are faulty within 48 hours without stopping generation; key activities, thermal flights and analysis; key resources, licensed pilots and a thermal camera; revenue, a fee per job; cost structure, fixed and per-job costs. A strong answer tags every block as fact or assumption.
- Record 2: the riskiest assumption is usually whether customers will pay, not the technology. A good MVP does not buy expensive equipment but offers a paid pilot service and measures commitment of money or time, not praise. The criterion is a number written before contacting customers, for example pivot if fewer than 20% agree to pay (as in Example 1).
- Table 3 (with Example 2's figures): price 3,500 baht per job, variable cost 1,400 baht per job, contribution margin 2,100 baht per job (60% of price), fixed cost 60,000 baht per month, jobs needed 60,000/2,100 = 28.57, rounded up to 29 per month. Group figures may differ, but must use Q = FC/(P - VC) and always round up.
- 22.5% passes the 20% criterion, so the team can keep testing, but the 95% confidence interval of about 10.8% to 38.5% straddles the criterion, so this is early evidence, not proof that the market is big enough. A good next step is a larger test before a big investment. A strong answer does not move the criterion after seeing the result.
- With Example 2's figures: a 10% price cut to 3,150 baht leaves a contribution margin of 1,750 baht per job (56%), so 60,000/1,750 = 34.29, rounded up to 35 jobs a month, up from 29, about 21% more for only a 10% price cut. A strong answer compares this with the number of customers actually tested and proposes revisiting price, cost or segment before hiring.
- Software and manuals are protected by copyright, the service name and mark by trademark (10 years, renewable for 10-year periods), the shape of the camera mount by a design patent (10 years), and a new mechanism with an inventive step by an invention patent (20 years from filing) or a petty patent (6 years, renewable twice for 2 years each). Public disclosure before filing can destroy novelty so the invention can no longer be patented; check the current rules with the Department of Intellectual Property before filing.
- Example 3: at an 8% rate the spin-off looks better (NPV about 664,986 baht against about 449,680 baht for the licence), but at 20% to reflect a new company's risk its NPV becomes about -21,888 baht. The spin-off also needs 1.2 million baht and the team's full time. A reasonable answer is to license first and consider a spin-off once there is evidence it can sell. If the grant is state funding under the 2021 Act, the owner must use the result within two years, share income with the researchers (section 14) and get the funder's consent to transfer ownership (section 15), and the team must first read the grant contract and the university's IP policy.
Discussion questions
- Why is a customer saying it sounds interesting not evidence, and what kind of evidence is stronger?
- How are low-cost drones that map well enough a disruptive innovation for small-area survey work, and how should incumbent firms respond?
- What should a service built on low-TRL technology tell its customers, and which kind of funding suits it better?
Adapting to student background
- Upper secondary (M.6)
- Link the MVP confidence interval to the statistics they know and have them explain why the job count is always rounded up; pair them with a peer who has service work experience to make the customer segment and per-job costs realistic.
- Vocational certificate
- Let them choose a drone service they have seen or done, fill the Canvas block by block with sticky notes, and compute contribution margin with a fill-in table: price minus variable cost, then divide fixed cost.
- Diploma
- Extension: estimate the variable cost per job from real items they can price (travel, battery cycles, processing hours) instead of the assumed figure, and test how the jobs needed change.
4Worksheet 4 Analysing cost options
Analysis activity · About 4 h of class time · CLO3
Objective: Compare options by TCO, break-even and NPV, test assumptions and draft TOR acceptance criteria
Equipment
- Worksheet E02 in the knowledge unit on lifecycle cost and acceptance
- Spreadsheet or Python and the module 4 example code
Safety
- Desk work only; no flying
Steps
- Compute TCO for the two options in worksheet E02
- Increase the in-house option's maintenance by 30% and find the new break-even
- Compute NPV at 6% with cash flow of 250,000 baht a year and find the minimum cash flow for a non-negative NPV
- List at least five costs the lesson example does not count
- Draft three TOR acceptance criteria stating the deliverable, test method and evidence the contractor must submit
Deliverables
- TCO and break-even before and after the change
- NPV and minimum cash flow
- List of missing costs
- Three acceptance criteria
Checklist
- Table 1 has all four cases (24 and 4 jobs a year, before and after the change) in baht, and the break-even shows its working
- Table 2 gives NPV at 350,000 and 250,000 baht a year and the minimum cash flow for a non-negative NPV, counting the 50,000 baht equipment sale in year 4
- Every assumption used is stated (discount rate, constant or inflation-inclusive prices, the adjusted maintenance) and at least two assumptions are varied
- The missing-cost list has at least five items, and all three acceptance criteria have a number, a test method and evidence
- The group's conclusion states the recommended option and the conditions that would change it, written for management to understand
Instructor guide
Class timing
- Review TCO, break-even and the time value of money30 min
- Compute TCO and break-even from worksheet E02 and after the maintenance change60 min
- Compute NPV and the minimum cash flow50 min
- Brainstorm missing costs30 min
- Draft TOR acceptance criteria40 min
- Wrap-up, questions and hand-in checklist30 min
Expected results
- Table 1 (lesson and E02 values: in-house setup 240,000 baht, fixed 90,000 baht a year, 2,000 baht per job; service 12,000 baht per job; 3 years, undiscounted): before the change, 24 jobs gives in-house 654,000 and service 864,000 (in-house cheaper), 4 jobs gives 534,000 and 144,000 (service cheaper), break-even 17 jobs a year. Treating maintenance as the fixed annual cost raised 30% to 117,000 baht: 24 jobs gives 735,000 and 864,000, 4 jobs gives 615,000 and 144,000, break-even 591,000/30,000 = 19.7, rounded up to 20 jobs a year. If the group separates maintenance from fixed cost as in the E02 file, numbers may differ but the formula is the same.
- Table 2 (900,000 baht invested in year 0, equipment sold for 50,000 baht at the end of year 4): at 350,000 baht a year NPV is about 352,392 baht, payback 2.57 years; at 250,000 baht a year NPV is about 5,881 baht, still slightly positive, payback 3.60 years; the minimum cash flow for zero NPV = (900,000 - 50,000/1.06^4)/3.4651, about 248,303 baht a year. Accept 248,000 to 248,400 baht from rounding or a bisection search.
- Table 3: good criteria have a number and a test method, for example (practice values from module 2) ground sampling distance no coarser than 3 cm, read from the processing report; horizontal RMSE at independent checkpoints no more than 5 cm with at least 5 checkpoints not used in processing, evidenced by a checkpoint table; 100% coverage of the agreed boundary with no gaps, checked by overlaying the boundary file; GeoTIFF with the coordinate system stated. Words like nice images or good quality are not criteria.
- The break-even moves from 17 to about 20 jobs a year. At 24 jobs in-house is still cheaper (735,000 against 864,000 baht), but the gap shrinks from 210,000 to 129,000 baht. Around 17 to 20 jobs a year is the range where the recommendation flips easily when assumptions change. A strong answer says real job volumes must be collected before deciding, and that both options must deliver work passing the same criteria before prices can be compared.
- At 250,000 baht a year NPV is only about 5,881 baht, barely positive. The minimum cash flow of about 248,303 baht is about 101,700 baht, or roughly 29%, below the expected 350,000, so if demand falls by more than about a third of what was expected the project no longer pays at 6%, and a 3.6-year payback nearly equals the 4-year life. The cash-flow assumption matters more than the discount rate, so real demand data should be collected before investing.
- Costs the lesson does not count include replacing degraded batteries, insurance, training and retraining new staff, annual software licences, data storage, downtime for repairs, re-flying jobs that fail acceptance, permit fees and staff time, and disposal at end of life. Most add to the in-house option and push the break-even up. The biggest effects usually come from fixed annual costs such as staff and insurance, because they are multiplied by the number of years. A strong answer separates estimates from real quotations.
- Dividing by all jobs makes failed jobs look free even though total cost does not fall: in Example 1, 100 accepted jobs give 1,000 baht per job, but only 80 accepted raises it to 1,250 baht per job. TOR acceptance criteria hold the in-house and service options to the same standard, so the cost comparison is between work of equal quality.
Discussion questions
- Is the option cheapest to buy still the best value over its whole life? Give an example from your results.
- If you use constant prices with an inflation-inclusive discount rate, which way is the result biased, and why does NIST warn about it?
- Municipal procurement by general invitation takes time. How should that time be built into the project schedule?
Adapting to student background
- Upper secondary (M.6)
- Have them derive the break-even formula by setting the two costs equal, and find the minimum cash flow with the present-value factor by hand before using the code.
- Vocational certificate
- Use a spreadsheet with the formula cells prepared, changing one number at a time to see the effect, and brainstorm missing costs from real equipment upkeep such as batteries, spares and propellers.
- Diploma
- Extension: add three of the missing costs they can estimate to the TCO code, find the new break-even, and write a fourth acceptance criterion for equipment delivery.
5Worksheet 5 Pitching the service-unit proposal
Analysis activity · About 4 h of class time · CLO3, CLO2
Objective: Combine modules 1–4 into an evidence-based proposal, assess five feasibility dimensions, test decision sensitivity and answer a panel
Equipment
- The group's work from worksheets 1–4
- Criteria from the knowledge unit on choosing drone missions to fit the problem
- Slide and spreadsheet software
Safety
- Desk work and presentation; no flying
Steps
- Combine modules 1 to 4 into a five-minute pitch following Figure 2
- Draft a business-plan outline covering every section at least briefly, with a three-year income statement and first-year monthly cash flow made with the code in Example 1
- Build the five-dimension feasibility table with evidence held and still needed
- Build a weighted matrix and find how much a weight must change to flip the decision
- Present to the class
- Act as a panel, ask at least three questions challenging another group's key assumptions and score with the criteria
Deliverables
- Five-minute pitch slides
- Five-dimension feasibility table
- Weighted matrix and tipping point
- Score sheet for another group
- Business-plan outline and financial projections
Checklist
- Table 1 covers all five dimensions, each separating evidence held from still to check, and the legal row names permits, PDPA and IP
- Table 2 excludes options failing a must-have first, weights sum to 1, and the weight change that flips the decision is stated
- Table 3 has all 12 months including the up-front equipment payment and late customer payments, marks the lowest-cash month, and the three-year income statement is attached
- The business-plan outline has every section of the lesson's table at least briefly, and sales and cost figures agree throughout
- The five-minute slides end with the ask and measurable stop conditions, and the score sheet for another group has at least three questions challenging its assumptions
Instructor guide
Class timing
- Review the pitch structure, five feasibility dimensions and the business plan20 min
- Combine modules 1-4 into the business-plan outline and financial projections60 min
- Feasibility table and weighted matrix45 min
- Prepare the five-minute slides30 min
- Pitches and panel questions70 min
- Wrap-up, questions and hand-in checklist15 min
Expected results
- Table 1: the lesson's five dimensions: market (MVP result and market size), technical (TRL, pilot results, acceptance criteria), financial (TCO, NPV, break-even), legal (permission to fly in the area, PDPA, IP) and operational (WBS, risk register, team readiness). A strong answer marks at least one dimension as not yet known instead of claiming every dimension passes without evidence.
- Table 2 (with the lesson's figures): base weights 0.35/0.25/0.20/0.20 give in-house 3.60, service 3.55 and existing method 3.40, but the existing method is excluded first because it fails the deliverable requirement. With readiness weighted more (0.30/0.20/0.30/0.20), service scores 3.70 and in-house 3.40, so the decision flips. Tipping point: moving only about 0.0125 (1.25 percentage points) of weight from three-year cost to team readiness makes the two options equal, or about 0.017 from the deliverable criterion, because in-house leads by only 0.05.
- Table 3 (with Example 1: 240,000 baht equipment paid up front, fixed 150,000 baht a year or 12,500 baht a month, variable 2,000 baht per job, price 12,000 baht, paid 2 months after delivery, monthly jobs 0,0,1,1,1,2,2,2,2,3,3,3): cumulative cash for months 1 to 12 = -252,500, -265,000, -279,500, -294,000, -296,500, -301,000, -305,500, -298,000, -290,500, -285,000, -279,500, -262,000 baht; lowest -305,500 baht in month 7. Three-year income statement (20, 35, 48 jobs): profit 50,000, 200,000 and 330,000 baht before depreciation, interest and tax.
- With Example 1, cash bottoms at -305,500 baht in month 7 and is still -262,000 baht at year end, although year 1 shows a 50,000 baht profit, because the 240,000 baht of equipment is paid up front and customers pay 2 months late, so profit is not cash. The funding request must cover at least the low point, about 310,000 baht, plus a reserve in case jobs arrive more slowly, not just the equipment price.
- With the lesson's figures in-house leads the service by only 0.05, and moving about 1.25 percentage points of weight from cost to team readiness makes them equal, so the decision is very sensitive to the weights. The honest conclusion is that the two options are close and depend on team readiness, which should be checked for real (licensed pilots, processing experience) before deciding. A strong answer does not offer a single answer without its sensitivity.
- SOM in jobs per year = 120 x 6 x 0.45 x share = 324 x share, which must reach at least 17 jobs, so the share must be at least 17/324, about 5.25%, against the assumed 15% (SOM about 48.6 jobs, or 583,200 baht a year). That leaves a wide margin, but the 45% and 15% are assumptions about a hypothetical province and need evidence, such as MVP results, before going into the proposal.
- The weakest dimension is often legal (permission to fly in the area) or operational (team readiness). If any dimension fails, the proposal should not proceed even if the finances are excellent, for example worthwhile but not permitted to fly in the area; a total score must not compensate for a failed must-have. A strong answer says how to make that dimension pass and sets a stop condition if it cannot.
- Open answer. A strong answer quotes the actual question received, says whether the group's answer rested on a checked fact, an assumption or an open question, and names the evidence it will collect (for example MVP results, real quotations or a written reply from an agency). Acknowledging limits openly counts as a strength.
Discussion questions
- Executives have a few minutes. Which information must be in the pitch and which can go to the appendix?
- Why does showing how sensitive the decision is to the weights earn more trust than offering a single answer?
- Is stopping an ineffective project early a success or a failure, and who should make the decision to stop?
Adapting to student background
- Upper secondary (M.6)
- Have them write the weighted-score formula and find the tipping point algebraically (score gap divided by the difference in criterion scores); give extra rehearsal time for pitching and answering, as they often have little real presenting experience.
- Vocational certificate
- Use a month-by-month fill-in cash-flow table (cash in, cash out, running total), and let presenters use their real field experience as evidence for the operational dimension.
- Diploma
- Extension: test customers paying 3 months late instead of 2 in the code, revise the funding request to the new low point, and prepare an answer for the panel on it.
Scoring rubric
For worksheets and the mini-project. Each criterion scores level (1–4) ÷ 4 × weight.
| Criterion | Weight | Excellent (4) | Good (3) | Fair (2) | Needs work (1) |
|---|---|---|---|---|---|
| Project planning and control | 25% | Charter, WBS, critical path and EVM correct and consistent; numbers used to decide | Nearly all correct | Parts missing or inconsistent | No usable plan or many errors |
| Accuracy of financial analysis | 25% | TCO, break-even, NPV and contribution margin all correct; assumptions stated and sensitivity tested | Nearly all correct; assumptions stated | Some errors or assumptions not stated | Many errors or no method |
| Innovation concept and business model | 25% | Measurable value proposition, MVP tests the riskiest assumption, sound IP plan | Complete with minor weaknesses | Vague value or MVP misses the key assumption | No usable business model |
| Pitching and answering questions | 25% | Concise, evidence for every claim, limits acknowledged, challenging questions answered directly | Clear; answers most questions | Lacks evidence or answers miss the point | Pitch does not communicate |
Assessment map: CLOs and how they are assessed Draft
The CLOs are a web-team draft; the course owner sets the final ones (curriculum book, part 4). This table is built from the worksheet and module-quiz data, so it follows any change to the CLOs.